ENOCH HILL WINDFARM

(15nr Turbine Bases)
Principal Contractor: Farrans

FSHV Installed ducting, bolt cages, tied reinforcement and poured concrete on 15nr turbine bases on Enoch Hill Windfarm. This was particularly challenging as all of the works were carried out over the winter months to meet connection dates but we are proud of the results for our client.